Scripts for the calls that happen during a construction project

Tark AI Team ยท

The calls that come during a construction project fall into five kinds: where is my crew, what is this charge, what did you find behind the wall, can you add this, and the neighbor who is unhappy. Each has a script, each ends with a specific time and a named person, and none of them should reach the project manager's cell phone before the office has taken the facts and promised a callback.

The five calls and who handles them

Caller says Office handles or routes Script ends with
"Nobody showed up today." or "Where is the crew?" Office handles, after checking the schedule A time the crew will be on site and a text confirming it
"What is this line on the invoice?" Office handles if it is in the contract; routes to the project manager if it is a change order Either the contract reference or a callback time
"The project manager says you found something behind the wall." Project manager handles; office takes the call, confirms a callback within hours A change order in writing before any work continues
"While you're here, can you also..." Office takes the request, project manager prices it A price and schedule impact within a day, nothing started until signed
Neighbor: "Your dumpster is blocking my driveway." Office handles A specific fix with a time, and the homeowner informed

A change order is a written amendment to the contract that describes added, removed or changed work, its cost and its effect on the schedule, signed by the homeowner before the work happens. Every one of the five calls can produce one, and the office's job is to make sure none of them produce work without one. The FTC's advice to homeowners is to insist on a written contract that spells out the work, the materials and the dates (FTC); the change order is how that contract stays true once the walls are open.

What do you say when the homeowner asks where the crew is?

Check the schedule before saying anything. Then:

"Let me look. The crew is at [reason: waiting on the inspection, finishing the tile at another site so your cabinets can go in Thursday, held by the cabinet delivery that slipped to Wednesday]. They'll be at your house [day and time]. I'll have [project manager] text you to confirm by end of day."

Three parts: where they are, why, when they will be there. Then a text from a named person.

What not to say: "I'll find out and call you back" with no time, "they should be there," or anything that blames a sub by name. The homeowner does not care whose fault it is. They care that nobody told them.

The call is avoidable. A text the evening before any day the crew will not be on site, with the reason and the next date, removes most of these calls. The office should own that text, because the project manager will forget it on the day it matters most.

How do you tell the homeowner what you found behind the wall?

The project manager owns this call, and the office owns getting it scheduled.

"I'm going to have [project manager] call you about that by [time], because it's a scope and cost conversation and you should hear it from the person who saw it. What I can tell you now is that nothing continues on that part of the job until you've approved a written change order, so there won't be a surprise on the invoice."

Then the project manager's call, in five parts, in this order: what was found, what it means for the work, what it costs, what it does to the schedule, and the sentence "nothing continues until you approve it in writing." Then the change order goes out the same day.

The order matters. A homeowner who hears the cost before they understand the problem argues with the cost. A homeowner who hears "we found the subfloor rotted under the old tub, it has to come out before the new one goes in, that's $X and two days" has already accepted it by the time the number arrives.

What do you say when the homeowner wants to add work?

Say yes to the question and no to the work.

"We can absolutely price that. [Project manager] will look at it [today or tomorrow] and get you a price and how many days it adds. Once you sign that, the crew adds it to the schedule. I'll ask them not to start on it before then, so it's clear what you're paying for."

The homeowner hears yes. The crew hears nothing until the change order is signed. The dispute six weeks later about whether the extra outlets were included never happens.

Our position: the handshake change is not a courtesy to the homeowner. It is a dispute scheduled for the final invoice, and the office that lets it through is the one that will hear about it.

The neighbor's call

Neighbors do not call the contractor to be difficult. They call because something specific is bothering them and the homeowner is at work.

"Thank you for calling us instead of the city. Tell me exactly what's going on." Then one of: the dumpster moves by [time], the crew will not park on your side of the street starting today, the saw cutting will stop at [time] each day, the debris on your lawn will be picked up by end of day.

Then the office tells the homeowner the neighbor called and what was done. The homeowner finds out from you, not over the fence.

A neighbor handled well on the first call is a lead in eighteen months. A neighbor ignored on the first call is a stop-work order from the city on the second.

What should the project manager see on the ticket?

  • Which of the five calls, and the homeowner's words.
  • What the office already said: the time promised, the callback promised, the "nothing continues until signed" line if it was used.
  • For a request to add work: what, where, and whether the homeowner expects it to be free.
  • For a neighbor call: what was promised and by when.
  • For a "where is my crew" call: what the office told the homeowner, so the project manager's text matches.

The project manager should never contradict the office. That requires the office to write down what it said, in one line, before the call ends.

Example call: "nobody showed up today"

A sample exchange, not a recording.

Caller: "It's 9:30 and nobody's here. We took the day off for this."

Office: "I'm sorry, let me look at the schedule right now." Ten seconds. "Here's what happened. The cabinets that were due Monday slipped to Wednesday, so the crew moved to another site today rather than sit at your house with nothing to install. They'll be at your house Thursday at 7:30 to start the install, and the counters template Friday. You should have heard that last night and you didn't; that's on us."

Caller: "So we lose two days?"

Office: "The install starts two days later than planned. The finish date moves from the 28th to the 30th, unless the crew makes it up during the counters, which they sometimes do. I'll have Marcus text you by 5 today to confirm Thursday and the new finish date, so you have it in writing."

Caller: "Fine. But I want to know before, not after."

Office: "Agreed. From now on you'll get a text the evening before any day the crew isn't on site, with the reason and the next date. I'm putting that on the project now."

On the project record, one line: "Homeowner called 9:30, told crew Thursday 7:30, finish moves to 30th, Marcus to text by 5, evening-before texts promised." Marcus reads it before he texts, and his text matches what the office said.

Where these scripts stop working

Commercial projects with a general conditions clause and a formal RFI and change-order process. The client's process overrides the scripts, and the office should know which projects those are.

Insurance restoration jobs, where "we found more damage" is a supplement to the adjuster, not a change order to the homeowner, and the conversation runs through the claim.

And the project that is already in dispute. Once a homeowner has stopped paying or mentioned a lawyer, the scripts above are not the answer. The owner takes those calls, and nothing is promised on the phone.

How a custom voice agent runs these calls

The agent answers every mid-project call, identifies which of the five it is, and reads the schedule from the company's project system before it answers "where is my crew." It gives the time and the reason, sends the confirming text in the project manager's name, and logs what it said on the project. For scope and cost calls it takes the facts, promises the project manager's callback by the owner's standard time, and says the "nothing continues until signed" line in the owner's words. It takes neighbor complaints with the specific fix the owner approved for each type and notifies the homeowner. The project manager sees one ticket per call with exactly what was promised, and the homeowner stops calling the cell phone.

Related reading: Eight questions a contractor should ask before driving to an estimate and The ten questions homeowners ask contractors, answered. For what the agent does for contractors, see the industry page.

To see how the agent would handle your mid-project calls, Book a Demo today.

Frequently asked questions

What should the office say when a homeowner calls asking where the crew is?

The truth, with a time. Say where the crew is, why, and when they will be on site, and then say who will confirm that by text. The caller is not angry about the delay yet. They are angry about not knowing. A specific time and a text ends the call.

How should a contractor explain a change order to a homeowner on the phone?

What was found, what it means for the work, what it costs, what it does to the schedule, and the fact that nothing continues until the homeowner approves it in writing. Then send the change order the same day. The call prepares the homeowner; the document gets the signature.

Who should handle homeowner calls during a project: the office or the project manager?

The office takes every call and resolves the ones it can: schedule questions, material deliveries, payment timing. It routes decisions about scope, cost and quality to the project manager with a promised callback time. Homeowners should never have to chase the project manager's cell phone.

What do you do when a neighbor calls to complain about the job site?

Thank them, take the specific complaint, and give a specific fix with a time: the dumpster moves tomorrow, the crew stops using the driveway today, the radio goes off. Then tell the homeowner. A neighbor handled well on the first call does not call the city on the second.

How do you handle a homeowner who wants to add work mid-project?

Say yes to pricing it and no to starting it until it is a signed change order with a schedule impact. The project manager visits or calls within a day with the price and the days added. Added work that starts on a handshake is the work that ends in a dispute.